Week of November 13 through November 19, 2022.
1
2
3
4
5
6
Links:
[back]
[home]
Enjoy!
#1
◱ We got it with our starting word. That was weird and shocking.
#2
◱ Finally getting the sticker on the Sienna1 van.
#3
◱ Lois made good progress on the fence line between the two car gates.
#4
◱ Lois is laying down on the job, as she stretches to plant bulbs.
#5
◱ Laura and Lois did a horrible puzzle. Look at the edges.
#6
◱ Laura and Lois did a horrible puzzle. Look at the edges. The edges are beautiful but harder. They even include cutouts for space holders until the puzzle stays together.
#7
◱ Harvest Right delivery.
#8
◱ Harvest Right delivery.
#9
◱ Lois dried more tomatoes. Laura loves the tomato chips.
#10
◱ Alex likes to earn money by mowing. He said it was cold.
#11
◱ Alex mowing.
#12
◱ Rigid foam under the west door of the Bower.
#13
◱ Don untangles a 100ft Cat5 network cable.
#14
◱ WiFi Client converts the internet signal from air to wire inside the Poison room.
#15
◱ The foundations of bunkhouses B2 16x24 and B3 16x24.
#16
◱ The foundations of bunkhouses B2 and B3.
#17
◱ Don admiring the view of The Bower and bunkhouse B2 foundation.
#18
◱ Bunkhouse B2 anchored to the ground and brackets installed for floor joists.
#19
◱ Floor joists are being installed for B2, end of day one.
#20
◱ Weyerhauser Edge Gold flooring in B2.
#21
◱ B2 Germany 16x24 is being built at Rosewold.
#22
◱ B2 floor is complete. Just add walls, a roof, and some sheet vinyl, right?
#23
◱ B2 Germany two walls are up. Luke is very hard working.
#24
◱ B2 Germany two walls are up. B4 & B6 are in the background.
#25
◱ B2 Laura showing that Germany walls are up.
#26
◱ B2 You can see the height of the walls compared to Laura who is also tall..
#27
◱ Bunkhouse B3 showing how the is concrete sloped for runoff and the bunkhouse is level.
#28
◱ B3 at the end of the day one.
#29
◱ B3 Asia 16x24 is being built at Rosewold.
#30
◱ B2 truss jig.
#31
◱ B4 Norway 8x12 is in position at Rosewold.
#32
◱ We had some vinyl left over but not much. It was a piece 7.5'x12. B4 is 8x12 on the outside supposedly.
#33
◱ Joseph and Don making a step out of concrete blocks.
#34
◱ Joseph and Don making a step out of concrete blocks.
#35
◱ Joseph making a step out of concrete blocks.
#36
◱ Laura cleaning up the vinyl mess that Lois made.
#37
◱ Lois relaxing after working hard.
#38
◱ The new floor in B4 Norway.
#39
◱ Putting the bed back into B4.
#40
◱ Putting the bed back into B4.
#41
◱ Putting the bunkbed back together.
#42
◱ Joseph lying on the queen mattress in the loft.
#43
◱ Lois lying on the queen mattress in the loft.
#44
◱ Now to get back down.
#45
◱ Lois getting down.
#46
◱ Laura trying out the bunkbed.
#47
◱ B5 Sweden 12x12 is done at the factory and will be delivered Nov 30.
#48
◱ B6 Finland 10x12 is in position at Rosewold.
#49
◱ B7 Denmark 12x12 is done at the factory and will be delivered Nov 30.
#50
◱ B7 Denmark back, at the factory.
#51
◱ B7 Denmark side, at the factory.
#52
◱ B7 Denmark inside
#53
◱ Laura likes the Jelly Bellys. This is outside in The Bower.
Validate:
html5
css3
You are visitor number to this page.
53 items. This page was last updated 2022-11-20 09:25:18 PST.