Week of November 13 through November 19, 2022.

    Links:   [back]   [home]

Enjoy!

We got it with our starting word. That was weird and shocking.
#1  We got it with our starting word. That was weird and shocking.
Finally getting the sticker on the Sienna1 van.
#2  Finally getting the sticker on the Sienna1 van.
Lois made good progress on the fence line between the two car gates.
#3  Lois made good progress on the fence line between the two car gates.
Lois is laying down on the job, as she stretches to plant bulbs.
#4  Lois is laying down on the job, as she stretches to plant bulbs.
Laura and Lois did a horrible puzzle. Look at the edges.
#5  Laura and Lois did a horrible puzzle. Look at the edges.
Laura and Lois did a horrible puzzle. Look at the edges. The edges are beautiful but harder. They even include cutouts for space holders until the puzzle stays together.
#6  Laura and Lois did a horrible puzzle. Look at the edges. The edges are beautiful but harder. They even include cutouts for space holders until the puzzle stays together.
Harvest Right delivery.
#7  Harvest Right delivery.
Harvest Right delivery.
#8  Harvest Right delivery.
Lois dried more tomatoes. Laura loves the tomato chips.
#9  Lois dried more tomatoes. Laura loves the tomato chips.
Alex likes to earn money by mowing. He said it was cold.
#10  Alex likes to earn money by mowing. He said it was cold.
Alex mowing.
#11  Alex mowing.
Rigid foam under the west door of the Bower.
#12  Rigid foam under the west door of the Bower.
Don untangles a 100ft Cat5 network cable.
#13  Don untangles a 100ft Cat5 network cable.
WiFi Client converts the internet signal from air to wire inside the Poison room.
#14  WiFi Client converts the internet signal from air to wire inside the Poison room.
The foundations of bunkhouses B2 16x24 and B3 16x24.
#15  The foundations of bunkhouses B2 16x24 and B3 16x24.
The foundations of bunkhouses B2 and B3.
#16  The foundations of bunkhouses B2 and B3.
Don admiring the view of The Bower and bunkhouse B2 foundation.
#17  Don admiring the view of The Bower and bunkhouse B2 foundation.
Bunkhouse B2 anchored to the ground and brackets installed for floor joists.
#18  Bunkhouse B2 anchored to the ground and brackets installed for floor joists.
Floor joists are being installed for B2, end of day one.
#19  Floor joists are being installed for B2, end of day one.
Weyerhauser Edge Gold flooring in B2.
#20  Weyerhauser Edge Gold flooring in B2.
B2 Germany 16x24 is being built at Rosewold.
#21  B2 Germany 16x24 is being built at Rosewold.
B2 floor is complete. Just add walls, a roof, and some sheet vinyl, right?
#22  B2 floor is complete. Just add walls, a roof, and some sheet vinyl, right?
B2 Germany two walls are up. Luke is very hard working.
#23  B2 Germany two walls are up. Luke is very hard working.
B2 Germany two walls are up. B4 & B6 are in the background.
#24  B2 Germany two walls are up. B4 & B6 are in the background.
B2 Laura showing that Germany walls are up.
#25  B2 Laura showing that Germany walls are up.
B2 You can see the height of the walls compared to Laura who is also tall..
#26  B2 You can see the height of the walls compared to Laura who is also tall..
Bunkhouse B3 showing how the is concrete sloped for runoff and the bunkhouse is level.
#27  Bunkhouse B3 showing how the is concrete sloped for runoff and the bunkhouse is level.
B3 at the end of the day one.
#28  B3 at the end of the day one.
B3 Asia 16x24 is being built at Rosewold.
#29  B3 Asia 16x24 is being built at Rosewold.
B2 truss jig.
#30  B2 truss jig.
B4 Norway 8x12 is in position at Rosewold.
#31  B4 Norway 8x12 is in position at Rosewold.
We had some vinyl left over but not much. It was a piece 7.5'x12. B4 is 8x12 on the outside supposedly.
#32  We had some vinyl left over but not much. It was a piece 7.5'x12. B4 is 8x12 on the outside supposedly.
Joseph and Don making a step out of concrete blocks.
#33  Joseph and Don making a step out of concrete blocks.
Joseph and Don making a step out of concrete blocks.
#34  Joseph and Don making a step out of concrete blocks.
Joseph making a step out of concrete blocks.
#35  Joseph making a step out of concrete blocks.
Laura cleaning up the vinyl mess that Lois made.
#36  Laura cleaning up the vinyl mess that Lois made.
Lois relaxing after working hard.
#37  Lois relaxing after working hard.
The new floor in B4 Norway.
#38  The new floor in B4 Norway.
Putting the bed back into B4.
#39  Putting the bed back into B4.
Putting the bed back into B4.
#40  Putting the bed back into B4.
Putting the bunkbed back together.
#41  Putting the bunkbed back together.
Joseph lying on the queen mattress in the loft.
#42  Joseph lying on the queen mattress in the loft.
Lois lying on the queen mattress in the loft.
#43  Lois lying on the queen mattress in the loft.
Now to get back down.
#44  Now to get back down.
Lois getting down.
#45  Lois getting down.
Laura trying out the bunkbed.
#46  Laura trying out the bunkbed.
B5 Sweden 12x12 is done at the factory and will be delivered Nov 30.
#47  B5 Sweden 12x12 is done at the factory and will be delivered Nov 30.
B6 Finland 10x12 is in position at Rosewold.
#48  B6 Finland 10x12 is in position at Rosewold.
B7 Denmark 12x12 is done at the factory and will be delivered Nov 30.
#49  B7 Denmark 12x12 is done at the factory and will be delivered Nov 30.
B7 Denmark back, at the factory.
#50  B7 Denmark back, at the factory.
B7 Denmark side, at the factory.
#51  B7 Denmark side, at the factory.
B7 Denmark inside
#52  B7 Denmark inside
Laura likes the Jelly Bellys. This is outside in The Bower.
#53  Laura likes the Jelly Bellys. This is outside in The Bower.

Validate:   html5   css3

You are visitor number to this page.
53 items. This page was last updated 2022-11-20 09:25:18 PST.