Week of October 16 through October 22, 2022.

    Links:   [back]   [home]

Enjoy!

Our pumpkin harvest this year.
#1  Our pumpkin harvest this year.

#2  
First rat I have seen on our property in the 10 years we have owned it. I have seen a lot of field mice. I am sure the neighbors cat killed it, but exactly where it caught it....I don't know.
#3  First rat I have seen on our property in the 10 years we have owned it. I have seen a lot of field mice. I am sure the neighbors cat killed it, but exactly where it caught it....I don't know.
Lois cleaning off the north village cement pad.
#4  Lois cleaning off the north village cement pad.
B4-Norway, B6-Finland
#5  B4-Norway, B6-Finland
B4-Norway, B6-Finland
#6  B4-Norway, B6-Finland
B4-Norway
#7  B4-Norway
B6-Finland
#8  B6-Finland
B4 Norway
#9  B4 Norway
Lois trying out the bunkbed. She decided the second mattress can go on top of this first one.
#10  Lois trying out the bunkbed. She decided the second mattress can go on top of this first one.
Lois pretending to sleep in B4 Norway.
#11  Lois pretending to sleep in B4 Norway.
Don labeling containers.
#12  Don labeling containers.
Don stenciled the names of the guys on the doors. B4 is Norway
#13  Don stenciled the names of the guys on the doors. B4 is Norway
James retrieves our chair out of the blackberry Vines.
#14  James retrieves our chair out of the blackberry Vines.
Sidewalk around red shed is framed.
#15  Sidewalk around red shed is framed.
Sidewalk around the red shed is framed.
#16  Sidewalk around the red shed is framed.
The concrete pour is framed.
#17  The concrete pour is framed.
Gravel is being placed on the framed in area.
#18  Gravel is being placed on the framed in area.
Framed in and gravel.
#19  Framed in and gravel.
Leveled and framed.
#20  Leveled and framed.
Don and Ken looking over the project.
#21  Don and Ken looking over the project.
The view from above.
#22  The view from above.
Knife River concrete and our four cement guys working on a pour.
#23  Knife River concrete and our four cement guys working on a pour.
Framing the sidewalk
#24  Framing the sidewalk
Trucks and workers everywhere.
#25  Trucks and workers everywhere.
Concrete coming for the village south pad.
#26  Concrete coming for the village south pad.
Keep the shoes clean.
#27  Keep the shoes clean.
Rebar and gravel ready for cement.
#28  Rebar and gravel ready for cement.
Pouring concrete and leveling.
#29  Pouring concrete and leveling.
Sidewalk done.
#30  Sidewalk done.
First truckload of three.
#31  First truckload of three.
This work looks really back breaking.
#32  This work looks really back breaking.
How do you get to the middle?
#33  How do you get to the middle?
Shed with roof still on.
#34  Shed with roof still on.
Shed and roof gone.
#35  Shed and roof gone.
Overhang gone.
#36  Overhang gone.
A load of wood comes.
#37  A load of wood comes.
Wood is here.
#38  Wood is here.
Shed with no roof.
#39  Shed with no roof.
Red shed gone.
#40  Red shed gone.
Getting ready to put in the end posts.
#41  Getting ready to put in the end posts.
Bower end posts in.
#42  Bower end posts in.
Red shed gone except part of the south wall.
#43  Red shed gone except part of the south wall.
Bower south wall studs.
#44  Bower south wall studs.
Bower east wall studs (and more).
#45  Bower east wall studs (and more).