#1
◱ Rooster coming today so we got up early to prepare.
#2
◱ Maybe rooster would like a perch.
#3
◱ Maybe rooster would like a perch.
#4
◱ Maybe rooster would like food?
#5
◱ Ready for rooster. Water. Food. Perches.
#6
◱ Rooster has arrived! He will be called King Arthur because he is big. And regal.
#7
◱ The girls are curious. Who is this newcomer?
#8
◱ Visiting hour at Arthur's prison, er, quarantine site.
#9
◱ Up on the housetop chickens pause.
#10
◱ More visiting hours.
#11
◱ The prisoner is free.
#12
◱ First night with his new harem.
#13
◱ His feet freaked Lois out for a minute until she realized it was the feather shanks.
#14
◱ We got some jumbo eggs. The white one is a regular large like you see in grocery stores.
#15
◱ So now you can compare what was inside.
#16
◱ I think we got a newbie layer blue egg. Not sure who laid it.
#17
◱ Don attaches Lois's castle to the west stairs.
#18
◱ Upgrading the gate for easier opening.
#19
◱ Lois hoses off the accumulated crud.
#20
◱ RCon future site south of the Red Shed.
#21
◱ CCon future site is choked with weeds surrounding the septic tanks.
#22
◱ CCon future site is choked with weeds. Dustin says "no problem."
#23
◱ Dustin scrapes off the weeds.
#24
◱ Dustin poses with his excavator. He is our pot of gold. (Notice the rainbow?)
#25
◱ Weeds gone. Ready for gravel.
#26
◱ Gravel has arrived. DJ is the driver.
#27
◱ Dustin distributes the gravel.
#28
◱ Goodbye weeds. Hello gravel.
#29
◱ CCon will have a firm foundation.
#30
◱ Guest House Canyon: The space between the garage and CCon. CCon is in place. The sidewalk looks like a canyon now.
#31
◱ Don works on the shelving in CCon.
#32
◱ Lois works on the shelving in CCon.
#33
◱ Don preps the electrical load center to be hung.
#34
◱ CCon west side.
#35
◱ CCon west side.
#36
◱ CCon west side.
#37
◱ CCon foundation block.
#38
◱ CCon foundation block.
#39
◱ CCon foundation block.
#40
◱ CCon foundation block.
#41
◱ RCon site preparation.
#42
◱ RCon site preparation.
#43
◱ RCon arrives.
#44
◱ RCon arrives.
#45
◱ RCon arrives.
#46
◱ RCon.
#47
◱ Red Canyon: the space between the red shed and RCon.
#48
◱ Dustin levels RCon.
#49
◱ Dustin puts gravel in place.
#50
◱ RCon south face.
#51
◱ RCon foundation block.
#52
◱ Don begins work in RCon.
#53
◱ Don blows out the crud. The crown moulding is already in place.
#54
◱ These 2x2 boards will support the lights.
#55
◱ Don tries putting up the first lighting board. Oops. The screws do not line up right.
#56
◱ Don attaches the revised lighting board to the 2x2 crown moulding.
#57
◱ Don attaches the lighting board to the 2x2 crown moulding.
#58
◱ Don puzzles over how to connect the bubble top to the outdoor outlet base.
#59
◱ Don's toy box came in the mail. Mostly electrical parts for CCon and RCon.