Week of April 22 through April 28

    Links:   [prev]   [next]   [back]   [home]

Enjoy!

Getting 16 tons of 1/4 minus quarry rock. It fills in nicely between the larger gravel that we buy, and makes nice walking paths.
#1  Getting 16 tons of 1/4 minus quarry rock. It fills in nicely between the larger gravel that we buy, and makes nice walking paths.
Joseph and Don use a construction level to make sure the hinges on the gate are at the same height.
#2  Joseph and Don use a construction level to make sure the hinges on the gate are at the same height.
That bare area on the right used to be covered with a large pile of construction debris. We got it disassembled so it can be used as raw materials for future projects.
#3  That bare area on the right used to be covered with a large pile of construction debris. We got it disassembled so it can be used as raw materials for future projects.

#4  

#5  
Getting ready for Rosewold Day. We are planning on having a ball.
#6  Getting ready for Rosewold Day. We are planning on having a ball.
Lois's "Tiny House."
#7  Lois's "Tiny House."

#8  

#9  

#10  

Validate:   html5   css3

You are visitor number to this page.
10 items. This page was last updated 2018-08-06 15:17:30 MDT.