Week of Oct 1 through 7
Links:
[back]
[home]
Enjoy!
#1
◱ Kitchen Sink before the groove was cut. rmk
#2
◱ Groove cut so sink will sit level with the counter top. rmk
#3
◱ View of the sink before putting it in the hole. rmk
#4
◱ Sink is positioned in the hole. rmk
#5
◱ Kitchen Sink Grills. rmk
#6
◱ Crown moulding around the tops of the kitchen cabinets. rmk
#7
◱ Typical bathroom sink. Kinda small.
#8
◱ Newly installed bathroom sink and toilet.
#9
◱ Bathroom Mirrors, ready to be installed.
#10
◱ Hot water heaters are in place, ready to be connected.
#11
◱ rm5b Grab Bars; all Bathroom Towel Racks
#12
◱ rm5b Master Bathroom Tile
#13
◱ Chairs. Don and Lois put chairs together. Don looks exhausted.
#14
◱ Joseph and Lois are surrounded by chickens.
Validate:
html5
css3
You are visitor number to this page.
14 items. This page was last updated 2017-10-07 21:30:26 MDT.