Week 2 of Sheetrock Progress
Links:
[back]
[home]
Enjoy!
#1
◱ 2017-08-06Great room south, paper on the floor.
#2
◱ 2017-08-06Great room southwest, paper on the floor.
#3
◱ 2017-08-06Hallway to Room4 west, paper on the floor.
#4
◱ 2017-08-06Hallway from Room4 to Room5 Master north, paper on the floor
#5
◱ 2017-08-06Room5 Master panorama west, paper on the floor.
#6
◱ 2017-08-06Room5 Master east through hallway and Kitchen to Room2.
#7
◱ 2017-08-07Day 1 of mudding, covering the screw heads and other sheetrock blemishes. Now it has to dry. Great room stairway.
#8
◱ 2017-08-07Day 1 of mudding, covering the screw heads and other sheetrock blemishes. Now it has to dry.
#9
◱ 2017-08-07Mudding near a doorway, filling in holes. After this they will sand it down and then fill things again.
#10
◱ 2017-08-07Debris from cleaning up sheetrock problems. Room2 doorway.
#11
◱ 2017-08-07Mudding around the edge of a bathtub/shower. Room2 bathroom.
#12
◱ 2017-08-07Room6 east ceiling Taping a seam between sheets of sheetrock.
#13
◱ 2017-08-07Room6 northeast stilt walking to smooth down the sheetrock tape.
#14
◱ 2017-08-11
#15
◱ 2017-08-11
#16
◱ 2017-08-11