#1 ◱ Y in the sewer line near the new 3000 gallon septic tank is marked by the 5.5 foot T post.
#2 ◱ West edge of the drain field is heaped up with brush scraped from the drain field area.
#3 ◱ Old septic system tank is being uncovered and will be destroyed.
#4 ◱ Old septic system tank is being uncovered and will be destroyed.
#5 ◱ We are getting some drainage from the old septic line. We rinsed it out with hose water but it appears it does not have the desired uniformly downward sloping alignment so there are some puddles inside.
#11 ◱ Here is a good view of the kind of rock going into the hole.
#12 ◱ This is the filled hole. No danger of having someone accidentally fall in now.
#13 ◱ Debris from the old septic tank is piled up for disposal.
#14 ◱ Debris from the old septic tank is piled up for disposal. The utility pole will be removed in a few minutes.
#15 ◱ We are clearing the western parking lot. One step is removing the old brown shed. Joseph walks nearby.
#16 ◱ Here is the old brown shed after it was picked up by the excavator's jaws.
#17 ◱ Joseph inspects the floor of the old brown shed and collects paint cans that were inside. Lois wanders past.
#18 ◱ The dump truck has a load of soil that will be distributed around the base of the house to bring the external grade to within 12 inches of the flood vents.