March 31 2015

    Links:   [prev]   [next]   [back]   [home]

Enjoy!

First coat of mud on east wall of main bathroom.
#1  First coat of mud on east wall of main bathroom.
South wall of main bathroom.
#2  South wall of main bathroom.
West well of main bathroom.
#3  West well of main bathroom.
North wall of main bathroom.
#4  North wall of main bathroom.
Work being done on HVAC system for addition and master bedroom.
#5  Work being done on HVAC system for addition and master bedroom.
HVAC system.
#6  HVAC system.

#7  

#8  

#9  

#10  

#11  

#12  

#13  

#14  

#15  

#16  

#17  

#18  

#19  

#20  

#21  

#22  

#23  

#24  
Akiko, Kili, and Kekoa on a Hawaiian Time lunch break.
#25  Akiko, Kili, and Kekoa on a Hawaiian Time lunch break.
North wall of main bathroom after second layer of mud.
#26  North wall of main bathroom after second layer of mud.
West wall of main bathroom after second wall of mud.
#27  West wall of main bathroom after second wall of mud.
East wall of main bathroom after second coat of mud.
#28  East wall of main bathroom after second coat of mud.
South wall of main bathroom after second coat of mud.
#29  South wall of main bathroom after second coat of mud.

Validate:   html5   css3

You are visitor number to this page.
29 items. This page was last updated 2018-08-06 16:18:12 MDT.