Mar 25 2015
Links:
[prev]
[next]
[back]
[home]
Enjoy!
#1
◱ Alex and Shannon removing flooring.
#2
◱ Alex and Shannon removing flooring.
#3
◱ Kekoa, Tia, and Kili. New OSB board and 2x4 studs.
#4
◱ Joseph measuring the floor.
#6
◱ Kekoa and Tia on the couch.
#7
◱ Kekoa and Tia on the couch.
#8
◱ Mikey in the shower and Joseph cutting the flooring.
#9
◱ Joseph working with the floor.
#10
◱
#11
◱ Joseph after removing a piece of flooring.
#12
◱ Mikey sweeping and Shannon removing nails.
#13
◱ Mikey working on removing a section of flooring.
#14
◱ Mikey and Shannon working on the floor.
#15
◱ Kekoa and Kili.
#16
◱ Joseph working on the flooring.
#17
◱ Joseph cutting a section of flooring.
#18
◱ Joseph pulling out nails.
#19
◱ Joseph removing flooring.
#20
◱ Shannon pulling out nails.
#21
◱ The sink area. Old PVC pipes that were sticking up have been broken off.
#22
◱ Joseph measuring 2x4s for extra floor support.
#23
◱ Joseph looking at the floor.
#24
◱ Joseph removing the toilet base wood.
#25
◱ Joseph removing loose 2x4 wood pieces.
#26
◱ Joseph removing loose 2x4 wood pieces.
#27
◱ Joseph building a toilet support.
#28
◱ Joseph adding support below the toilet.
#29
◱ Joseph adding support below the toilet.
#30
◱ Toilet drain pipe and supporting wood.
#31
◱ Shannon screwing the floor down. Joseph looking sweaty.
#32
◱ Joseph exhausted.
#33
◱ Toilet after the floor OSB has been installed.
#34
◱ Mikey sweeping.
#35
◱ Mikey sweeping the bathroom floor.
#36
◱ Tia and Mikey.
Validate:
html5
css3
You are visitor number to this page.
36 items. This page was last updated 2018-08-06 16:17:22 MDT.