Mar 10 2015

    Links:   [prev]   [next]   [back]   [home]

Insulation and stud markings.

Don's study, East door. House plans in a roll.
#1  Don's study, East door. House plans in a roll.
Don's study, north wall, drywall stacked ready for use. Exercise gym covered in plastic.
#2  Don's study, north wall, drywall stacked ready for use. Exercise gym covered in plastic.
Don's study. Exercise gym covered in plastic. Beadex all purpose joint compound.
#3  Don's study. Exercise gym covered in plastic. Beadex all purpose joint compound.
Don's study. Exercise gym covered in plastic. Beadex all purpose joint compound.
#4  Don's study. Exercise gym covered in plastic. Beadex all purpose joint compound.
Don's study, network closet, cleared out ready for drywall activity.
#5  Don's study, network closet, cleared out ready for drywall activity.
Don's bathroom, cleared out, insulated, ready for drywall.
#6  Don's bathroom, cleared out, insulated, ready for drywall.
Lois's loft, top of the stairs. Stack of drywall ready to be hung.
#7  Lois's loft, top of the stairs. Stack of drywall ready to be hung.
Lois's loft, stack of drywall ready to be hung. Gaming table covered in plastic.
#8  Lois's loft, stack of drywall ready to be hung. Gaming table covered in plastic.
Lois's loft looking east. Two stacks of drywall. Gaming table covered in plastic.
#9  Lois's loft looking east. Two stacks of drywall. Gaming table covered in plastic.
Lois's balcony with lots of stuff on it.
#10  Lois's balcony with lots of stuff on it.
Lois's balcony. Bathroom doors. Sectional sofa. One LED light.
#11  Lois's balcony. Bathroom doors. Sectional sofa. One LED light.
Lois's balcony. Ceiling fan. Sectional sofa parts.
#12  Lois's balcony. Ceiling fan. Sectional sofa parts.
Lois's loft, TV wall, bathroom, closet.
#13  Lois's loft, TV wall, bathroom, closet.
Master bedroom. LED lights (x20). Thermometers. Pillows. Bed.
#14  Master bedroom. LED lights (x20). Thermometers. Pillows. Bed.
Master bedroom, space cleared out for the installation of the new HVAC unit.
#15  Master bedroom, space cleared out for the installation of the new HVAC unit.

Validate:   html5   css3

You are visitor number to this page.
15 items. This page was last updated 2018-08-06 16:15:53 MDT.