Mar 10 2015
Links:
[prev]
[next]
[back]
[home]
Insulation and stud markings.
#1
◱ Don's study, East door. House plans in a roll.
#2
◱ Don's study, north wall, drywall stacked ready for use. Exercise gym covered in plastic.
#3
◱ Don's study. Exercise gym covered in plastic. Beadex all purpose joint compound.
#4
◱ Don's study. Exercise gym covered in plastic. Beadex all purpose joint compound.
#5
◱ Don's study, network closet, cleared out ready for drywall activity.
#6
◱ Don's bathroom, cleared out, insulated, ready for drywall.
#7
◱ Lois's loft, top of the stairs. Stack of drywall ready to be hung.
#8
◱ Lois's loft, stack of drywall ready to be hung. Gaming table covered in plastic.
#9
◱ Lois's loft looking east. Two stacks of drywall. Gaming table covered in plastic.
#10
◱ Lois's balcony with lots of stuff on it.
#11
◱ Lois's balcony. Bathroom doors. Sectional sofa. One LED light.
#12
◱ Lois's balcony. Ceiling fan. Sectional sofa parts.
#13
◱ Lois's loft, TV wall, bathroom, closet.
#14
◱ Master bedroom. LED lights (x20). Thermometers. Pillows. Bed.
#15
◱ Master bedroom, space cleared out for the installation of the new HVAC unit.
Validate:
html5
css3
You are visitor number to this page.
15 items. This page was last updated 2018-08-06 16:15:53 MDT.