March 6 2015

    Links:   [prev]   [next]   [back]   [home]

This is the day before the insulation goes in. Comparison photos.

Don's TV mount location
#1 ◱ Don's TV mount location
Lois's TV mount location, blocking shown.
#2 ◱ Lois's TV mount location, blocking shown.
Lois TV mount location, blocking closeup
#3 ◱ Lois TV mount location, blocking closeup
Lois Bathroom, cleared out ready for drywall
#4 ◱ Lois Bathroom, cleared out ready for drywall
Lois furniture out on the west balcony, covered, to make way for insulation and drywall.
#5 ◱ Lois furniture out on the west balcony, covered, to make way for insulation and drywall.
Lois Loft, NW corner.
#6 ◱ Lois Loft, NW corner.
Lois Loft, NE corner.
#7 ◱ Lois Loft, NE corner.
Don Study, NW corner, and exercise equipment.
#8 ◱ Don Study, NW corner, and exercise equipment.
Don Study, HVAC mounting location on West wall.
#9 ◱ Don Study, HVAC mounting location on West wall.
Don's equipment room, covered in plastic. Only the ceiling will be drywalled. The walls should be insulated too, right?
#10 ◱ Don's equipment room, covered in plastic. Only the ceiling will be drywalled. The walls should be insulated too, right?
Don's equipment room, ready for ceiling insulation.
#11 ◱ Don's equipment room, ready for ceiling insulation.
Don's equipment room, ready for ceiling insulation.
#12 ◱ Don's equipment room, ready for ceiling insulation.
Don's bathroom, toilet removed, ready for insulation.
#13 ◱ Don's bathroom, toilet removed, ready for insulation.
Don's bathroom, sink removed, ready for insulation and drywall.
#14 ◱ Don's bathroom, sink removed, ready for insulation and drywall.
Network closet, ready for insulation and drywall on the larger side of the space.
#15 ◱ Network closet, ready for insulation and drywall on the larger side of the space.
Don's study, East wall, ready for insulation and drywall.
#16 ◱ Don's study, East wall, ready for insulation and drywall.
Don's study, NE corner, ready for insulation and drywall.
#17 ◱ Don's study, NE corner, ready for insulation and drywall.
Don's study, North wall, ready for insulation and drywall.
#18 ◱ Don's study, North wall, ready for insulation and drywall.
NW Nat Gas work area.
#19 ◱ NW Nat Gas work area.
Fruit trees north of the horseshoe.
#20 ◱ Fruit trees north of the horseshoe.
Cherry tree.
#21 ◱ Cherry tree.
Pear trees.
#22 ◱ Pear trees.
Herb garden a week after weeds were cut down.
#23 ◱ Herb garden a week after weeds were cut down.
Elderberry tree.
#24 ◱ Elderberry tree.
Cherry trees.
#25 ◱ Cherry trees.
Trees south of the future greenhouse.
#26 ◱ Trees south of the future greenhouse.
Fuji apple tree.
#27 ◱ Fuji apple tree.
Space below the equipment room, refrigeration lines ready to be hooked up.
#28 ◱ Space below the equipment room, refrigeration lines ready to be hooked up.
Space below the equipment room, refrigeration lines ready to be hooked up.
#29 ◱ Space below the equipment room, refrigeration lines ready to be hooked up.
Space below the equipment room.
#30 ◱ Space below the equipment room.
Satsuma plum tree.
#31 ◱ Satsuma plum tree.
Asian pear trees.
#32 ◱ Asian pear trees.
Asian pear tree.
#33 ◱ Asian pear tree.
Asian pear tree.
#34 ◱ Asian pear tree.

Validate:   html5   css3

You are visitor number to this page.