March 6 2015
Links:
[prev]
[next]
[back]
[home]
This is the day before the insulation goes in. Comparison photos.
#1
◱ Don's TV mount location
#2
◱ Lois's TV mount location, blocking shown.
#3
◱ Lois TV mount location, blocking closeup
#4
◱ Lois Bathroom, cleared out ready for drywall
#5
◱ Lois furniture out on the west balcony, covered, to make way for insulation and drywall.
#6
◱ Lois Loft, NW corner.
#7
◱ Lois Loft, NE corner.
#8
◱ Don Study, NW corner, and exercise equipment.
#9
◱ Don Study, HVAC mounting location on West wall.
#10
◱ Don's equipment room, covered in plastic. Only the ceiling will be drywalled. The walls should be insulated too, right?
#11
◱ Don's equipment room, ready for ceiling insulation.
#12
◱ Don's equipment room, ready for ceiling insulation.
#13
◱ Don's bathroom, toilet removed, ready for insulation.
#14
◱ Don's bathroom, sink removed, ready for insulation and drywall.
#15
◱ Network closet, ready for insulation and drywall on the larger side of the space.
#16
◱ Don's study, East wall, ready for insulation and drywall.
#17
◱ Don's study, NE corner, ready for insulation and drywall.
#18
◱ Don's study, North wall, ready for insulation and drywall.
#19
◱ NW Nat Gas work area.
#20
◱ Fruit trees north of the horseshoe.
#21
◱ Cherry tree.
#22
◱ Pear trees.
#23
◱ Herb garden a week after weeds were cut down.
#24
◱ Elderberry tree.
#25
◱ Cherry trees.
#26
◱ Trees south of the future greenhouse.
#27
◱ Fuji apple tree.
#28
◱ Space below the equipment room, refrigeration lines ready to be hooked up.
#29
◱ Space below the equipment room, refrigeration lines ready to be hooked up.
#30
◱ Space below the equipment room.
#31
◱ Satsuma plum tree.
#32
◱ Asian pear trees.
#33
◱ Asian pear tree.
#34
◱ Asian pear tree.
Validate:
html5
css3
You are visitor number to this page.
34 items. This page was last updated 2018-08-06 16:15:24 MDT.