This is the day before the insulation goes in. Comparison photos.

Don's TV mount location
#1  Don's TV mount location
Lois's TV mount location, blocking shown.
#2  Lois's TV mount location, blocking shown.
Lois TV mount location, blocking closeup
#3  Lois TV mount location, blocking closeup
Lois Bathroom, cleared out ready for drywall
#4  Lois Bathroom, cleared out ready for drywall
Lois furniture out on the west balcony, covered, to make way for insulation and drywall.
#5  Lois furniture out on the west balcony, covered, to make way for insulation and drywall.
Lois Loft, NW corner.
#6  Lois Loft, NW corner.
Lois Loft, NE corner.
#7  Lois Loft, NE corner.
Don Study, NW corner, and exercise equipment.
#8  Don Study, NW corner, and exercise equipment.
Don Study, HVAC mounting location on West wall.
#9  Don Study, HVAC mounting location on West wall.
Don's equipment room, covered in plastic. Only the ceiling will be drywalled. The walls should be insulated too, right?
#10  Don's equipment room, covered in plastic. Only the ceiling will be drywalled. The walls should be insulated too, right?
Don's equipment room, ready for ceiling insulation.
#11  Don's equipment room, ready for ceiling insulation.
Don's equipment room, ready for ceiling insulation.
#12  Don's equipment room, ready for ceiling insulation.
Don's bathroom, toilet removed, ready for insulation.
#13  Don's bathroom, toilet removed, ready for insulation.
Don's bathroom, sink removed, ready for insulation and drywall.
#14  Don's bathroom, sink removed, ready for insulation and drywall.
Network closet, ready for insulation and drywall on the larger side of the space.
#15  Network closet, ready for insulation and drywall on the larger side of the space.
Don's study, East wall, ready for insulation and drywall.
#16  Don's study, East wall, ready for insulation and drywall.
Don's study, NE corner, ready for insulation and drywall.
#17  Don's study, NE corner, ready for insulation and drywall.
Don's study, North wall, ready for insulation and drywall.
#18  Don's study, North wall, ready for insulation and drywall.
NW Nat Gas work area.
#19  NW Nat Gas work area.
Fruit trees north of the horseshoe.
#20  Fruit trees north of the horseshoe.
Cherry tree.
#21  Cherry tree.
Pear trees.
#22  Pear trees.
Herb garden a week after weeds were cut down.
#23  Herb garden a week after weeds were cut down.
Elderberry tree.
#24  Elderberry tree.
Cherry trees.
#25  Cherry trees.
Trees south of the future greenhouse.
#26  Trees south of the future greenhouse.
Fuji apple tree.
#27  Fuji apple tree.
Space below the equipment room, refrigeration lines ready to be hooked up.
#28  Space below the equipment room, refrigeration lines ready to be hooked up.
Space below the equipment room, refrigeration lines ready to be hooked up.
#29  Space below the equipment room, refrigeration lines ready to be hooked up.
Space below the equipment room.
#30  Space below the equipment room.
Satsuma plum tree.
#31  Satsuma plum tree.
Asian pear trees.
#32  Asian pear trees.
Asian pear tree.
#33  Asian pear tree.
Asian pear tree.
#34  Asian pear tree.