April 9 2014
Links:
[prev]
[next]
[back]
[home]
Pictures by Joseph.
#1
◱ Sewage pipe has been moved out of the walking path.
#2
◱ Holes that have been dug for transplanting the apple trees.
#3
◱ Progress sealing Lois's deck in preparation for the floor.
#4
◱ Progress sealing Lois's deck in preparation for the floor.
#5
◱ Lois's sliding door without the door.
#6
◱ Bathroom with the shower still packaged up.
#7
◱ Lois's shower.
#8
◱ Taking a sliver off of the post.
Validate:
html5
css3
You are visitor number to this page.
8 items. This page was last updated 2018-08-06 16:02:44 MDT.