#1 ◱ Old siding is removed from the northeast half of the MH. A new, larger window will be installed. We can see the insulation and other construction details. New window will be same width but 4ft high, to match the windows in the addition. Also notice the portico that is under construction.
#2 ◱ Construction sketch shows planned larger window. Also 1/2 inch sheathing plus a band to be added at the deck framing level to adjust for extra wall thickness.
#3 ◱ Closeup of the bathroom window area. We are thinking about just removing the window if it is not required for building code. Currently it is not really used for ventilation but could be.