Jan 23 2014, Hardiplank

    Links:   [prev]   [next]   [back]   [home]

Enjoy!

Jump to Pictures by Joseph
Jump to Pictures by Isaac

View from the top of the stairs in Lois's loft.
#1  View from the top of the stairs in Lois's loft.
View through the sliding glass door in Lois's Loft.
#2  View through the sliding glass door in Lois's Loft.
View of the balcony of Lois's Loft.
#3  View of the balcony of Lois's Loft.
View of the felt on top of the cricket.
#4  View of the felt on top of the cricket.
Hardiplank being installed on the north side of the addition, working from the bottom to the top.
#5  Hardiplank being installed on the north side of the addition, working from the bottom to the top.
Hardiplank being installed on the west face of the addition, from bottom to top.
#6  Hardiplank being installed on the west face of the addition, from bottom to top.
A stack of hardiplank, ready to be fitted.
#7  A stack of hardiplank, ready to be fitted.
View from south of the house.
#8  View from south of the house.

back to top

Pictures by Joseph

North face, bottom half, is covered with hardiplank.
#9  North face, bottom half, is covered with hardiplank.
East face, no change yet.
#10  East face, no change yet.
West face, mostly covered on the bottom half.
#11  West face, mostly covered on the bottom half.
Steps up to the west landing.
#12  Steps up to the west landing.
View southwest across Lois's loft, including bathroom window, sliding door, west window, and northwest window.
#13  View southwest across Lois's loft, including bathroom window, sliding door, west window, and northwest window.
Lois's balcony. Felt on the cricket and on the west end of the north half of the old cottage roof.
#14  Lois's balcony. Felt on the cricket and on the west end of the north half of the old cottage roof.
View of the west end of the north half of the old cottage roof, from the southwest corner of that roof.
#15  View of the west end of the north half of the old cottage roof, from the southwest corner of that roof.
View of the middle half of the north half of the old cottage roof. Felt in place.
#16  View of the middle half of the north half of the old cottage roof. Felt in place.
View of nearly all of the north half of the old cottage roof. Felt is in place.
#17  View of nearly all of the north half of the old cottage roof. Felt is in place.
Cable connection to the east eaves of the old cottage, with drip loop.
#18  Cable connection to the east eaves of the old cottage, with drip loop.
View of the east half of the north half of the old cottage roof. Felt is in place throughout.
#19  View of the east half of the north half of the old cottage roof. Felt is in place throughout.
View of the east half of Lois's Loft. The four east windows are visible. The vaulted ceiling is visible.
#20  View of the east half of Lois's Loft. The four east windows are visible. The vaulted ceiling is visible.
Master bathroom floor repairs under way.
#21  Master bathroom floor repairs under way.
Master bathroom floor repairs. The trusses are in good shape but the plywood was shot.
#22  Master bathroom floor repairs. The trusses are in good shape but the plywood was shot.
Master bathroom floor repair.
#23  Master bathroom floor repair.
Master bathroom, toilet area, floor removed.
#24  Master bathroom, toilet area, floor removed.
East vanity of the master bathroom floor. Pipes are to the washing machine on the other side of the wall. The pipes do not look like non-freeze aquapex material.
#25  East vanity of the master bathroom floor. Pipes are to the washing machine on the other side of the wall. The pipes do not look like non-freeze aquapex material.
Closeup of the hardiplank in the area of the relocated electric meter box.
#26  Closeup of the hardiplank in the area of the relocated electric meter box.