#7 ◱ View out the west door, to be a sliding glass door, onto the balcony, which is sloped slightly away from the house for water runoff purposes.
#8 ◱ View up through the trusses at the worker as he adds plywood. View through the northeast corner of the room.
#9 ◱ View of the roof over the balcony, looking north. The white trailer power pole is visible.
#10 ◱ Entire south half of the new construction is roofed. The cricket area has plastic to help with rain management.
#11 ◱ View of the balcony from the roof of the old house. The old antenna is clearly shown.
#12 ◱ Western stairwell, stairs to be added soon. The power pole stood in this space, and parts of it are still visible.
#13 ◱ View of the balcony from west of the house. Below is the window into the equipment room, and to the right of that is the stairwell leading up to the west door.