South wall of Lois's Loft is in place. I thought we were going to frame in a door at the top of the stairs, but just not use it. Hmm.
#1  South wall of Lois's Loft is in place. I thought we were going to frame in a door at the top of the stairs, but just not use it. Hmm.
Piles of lumber.
#2  Piles of lumber.
North face of the addition.
#3  North face of the addition.
West face of the addition. Some of the deck is being added.
#4  West face of the addition. Some of the deck is being added.
West face. Deck base is being put in place.
#5  West face. Deck base is being put in place.
South wall of Lois's Loft, seen from inside the Loft.
#6  South wall of Lois's Loft, seen from inside the Loft.
South wall of Lois's Loft, seen from the roof of the old cottage.
#7  South wall of Lois's Loft, seen from the roof of the old cottage.
Lois's Loft, seen from above the hall bathroom. Three walls are up.
#8  Lois's Loft, seen from above the hall bathroom. Three walls are up.
Lois's Loft balcony, seen from above the master bathroom. Power pole is still in place. Some support beams are in place.
#9  Lois's Loft balcony, seen from above the master bathroom. Power pole is still in place. Some support beams are in place.
Stairs down from Lois's Loft to Don's Dungeon, complete with swampland.
#10  Stairs down from Lois's Loft to Don's Dungeon, complete with swampland.
View west from Lois's Loft through her sliding doors onto the balcony.
#11  View west from Lois's Loft through her sliding doors onto the balcony.
Isaac.
#12  Isaac.
Isaac with wheelbarrow. Out by the fairy tree.
#13  Isaac with wheelbarrow. Out by the fairy tree.
Worker constructing the east wall of Lois's Loft.
#14  Worker constructing the east wall of Lois's Loft.
East wall of Lois's Loft, still under construction.
#15  East wall of Lois's Loft, still under construction.
East wall of Lois's Loft, still under construction. Workers above and below.
#16  East wall of Lois's Loft, still under construction. Workers above and below.
Parking.
#17  Parking.
Hot water heater failed during the recent freeze. Apparently pipes broke, then drained, then the elements burned out.
#18  Hot water heater failed during the recent freeze. Apparently pipes broke, then drained, then the elements burned out.
Here are the burned-out elements from the hot water heater.
#19  Here are the burned-out elements from the hot water heater.