#4 ◱ Looking down into the hallway at the bottom of the stairs.
#5 ◱ Looking down into the stairwell that currently has a power pole in it.
#6 ◱ Looking northeast across the floor of Lois's Loft.
#7 ◱ Looking Northwest across the floor of Lois's Loft, from above the hall bathroom.
#8 ◱ Looking due west along the north half of the MH.
#9 ◱ Looking down the stairs from Lois's Loft. Lots of water on the floor. Nice puddles.
#10 ◱ Standing in the equipment room looking north through the window. Wood sheets being lifted to Lois's floor.
#11 ◱ Looking Northeast through Don's Study, out the corner windows and doorway. Puddles on the floor.
#12 ◱ View from Don's Study southwest toward the utility room door. View of Lois's stairs.
#13 ◱ View south from Don's study into Don's powder room. Also a view into the storage space under the stairs.
#14 ◱ View northeast out of Don's corner windows. Good view of the gates.
#15 ◱ TrusJoist.com, SFI Certified Sourcing. The joists that form the space between Lois's Loft above and Don's Study below.
#16 ◱ View of Don's Study from the east side of the addition. Don's east door, Don's east window.
#17 ◱ View of Don's study from the northeast corner. Don's east door and east window on the left. Don's north windows on the right. Equipment room north window on the far right.
#18 ◱ View from the northwest corner. The closest window is the north window of the equipment room. On the right side, the window is the west window of the equipment room. Then we have the opening for the stairwell leading up to the landing. There is a power pole in there that will be removed.
#19 ◱ View of the stairwell with the power pole to be removed. Steps will lead up to the landing, and from there up to Lois's Loft.
#20 ◱ View south from the horseshoe island, of the north wall of the addition. The two windows on the left are Don's study. The window on the right is the equipment room. There will be an electric meter between the middle and right windows.