Dec 31 2013
Links:
[prev]
[next]
[back]
[home]
Enjoy!
#1
◱ North wall of add-on.
#2
◱ Under the western part of the add-on.
#3
◱ A beam to get onto the add-on floor.
#4
◱ A wall section being assembled.
#5
◱ The construction area in the addition.
#6
◱ The eastern window on the north wall of the first floor of the add-on.
#7
◱ The north wall looking west.
#8
◱ The west window in the north wall.
#9
◱ Power pole before removal.
#10
◱ The west edge.
#11
◱ The power pole and area around it.
#12
◱ The beam to enter. A air compressor on the left and music on the right.
#13
◱ Insulation under the add-on.
#14
◱ Insulation under the add-on.
#15
◱ Insulation under the add-on.
#16
◱ Crawl space between the add-on and the main house.
#17
◱ West window. The power box will probably go to the right of it.
#18
◱ Wood getting ready to be turned into housing.
#19
◱ The whole north wall from the horseshoe.
Validate:
html5
css3
You are visitor number to this page.
19 items. This page was last updated 2018-08-06 15:46:42 MDT.