Dec 23 2013
  
  Links:
  [prev]
  [next]
  [back]
  [home]
Enjoy!
#1 
◱ Plywood forms that were removed from the cement work.  Joseph asked that they be left instead of taken to the dump.
 
#2 
◱ Lumber to be used in construction.
 
#3 
◱ Pony walls take shape in the footprint of the addition.
 
#4 
◱ Forms have been removed from all (or almost all) of the concrete.
 
#5 
◱ Western side, south corner.
 
#6 
◱ South side, western corner. Also the pop-out. Foundation and stem walls.
 
#7 
◱ Foundation and stem walls, pop-out, south side of the house.
 
#8 
◱ Back porch area, foundation and stem walls, ladder to back door.
 
#9 
◱ Pony walls, viewed from above, sitting on top of the stem walls and foundation. Also the plastic moisture barrier is seen.
 
#10 
◱ Close-up of the stem wall under the living room window. Bolts allow for attachment of pony walls.
 
#11 
◱ HVAC drainage line and supply lines. East side of the house.
 
#12 
◱ Worker creating pony wall.
 
#13 
◱ Rewrapping of heater tape on the main water supply system. The heat tape also goes inside the insulation noodles.
 
#14 
◱ West wall, access hatch. Under the master bathroom. Plumbing is visible.
 
#15 
◱ Under the house. HVAC supply and drainage.
 
#16 
◱ Inside the crawlspace of the addition. Uprights are in place.
 
#17 
◱ Uprights cut to proper length. Pony walls, bolted to stem walls.
 