Dec 23 2013

    Links:   [prev]   [next]   [back]   [home]

Enjoy!

Plywood forms that were removed from the cement work.  Joseph asked that they be left instead of taken to the dump.
#1  Plywood forms that were removed from the cement work. Joseph asked that they be left instead of taken to the dump.
Lumber to be used in construction.
#2  Lumber to be used in construction.
Pony walls take shape in the footprint of the addition.
#3  Pony walls take shape in the footprint of the addition.
Forms have been removed from all (or almost all) of the concrete.
#4  Forms have been removed from all (or almost all) of the concrete.
Western side, south corner.
#5  Western side, south corner.
South side, western corner. Also the pop-out. Foundation and stem walls.
#6  South side, western corner. Also the pop-out. Foundation and stem walls.
Foundation and stem walls, pop-out, south side of the house.
#7  Foundation and stem walls, pop-out, south side of the house.
Back porch area, foundation and stem walls, ladder to back door.
#8  Back porch area, foundation and stem walls, ladder to back door.
Pony walls, viewed from above, sitting on top of the stem walls and foundation. Also the plastic moisture barrier is seen.
#9  Pony walls, viewed from above, sitting on top of the stem walls and foundation. Also the plastic moisture barrier is seen.
Close-up of the stem wall under the living room window. Bolts allow for attachment of pony walls.
#10  Close-up of the stem wall under the living room window. Bolts allow for attachment of pony walls.
HVAC drainage line and supply lines. East side of the house.
#11  HVAC drainage line and supply lines. East side of the house.
Worker creating pony wall.
#12  Worker creating pony wall.
Rewrapping of heater tape on the main water supply system. The heat tape also goes inside the insulation noodles.
#13  Rewrapping of heater tape on the main water supply system. The heat tape also goes inside the insulation noodles.
West wall, access hatch. Under the master bathroom. Plumbing is visible.
#14  West wall, access hatch. Under the master bathroom. Plumbing is visible.
Under the house. HVAC supply and drainage.
#15  Under the house. HVAC supply and drainage.
Inside the crawlspace of the addition. Uprights are in place.
#16  Inside the crawlspace of the addition. Uprights are in place.
Uprights cut to proper length. Pony walls, bolted to stem walls.
#17  Uprights cut to proper length. Pony walls, bolted to stem walls.