Dec 16

    Links:   [prev]   [next]   [back]   [home]

Enjoy!

Northside of the house looking at the foundation for the add-on. Notice the sheet of R-5 insulation near the water heater.
#1  Northside of the house looking at the foundation for the add-on. Notice the sheet of R-5 insulation near the water heater.
Eastern side of house foundation wall.
#2  Eastern side of house foundation wall.
North side of the house.
#3  North side of the house.
Looking south along the west foundation line.
#4  Looking south along the west foundation line.
Looking east along the southern foundation line.
#5  Looking east along the southern foundation line.
Laser level to get everything the right height.
#6  Laser level to get everything the right height.
Looking north along the eastern foundation line.
#7  Looking north along the eastern foundation line.
Nailing up the boards to prepare for more concrete.
#8  Nailing up the boards to prepare for more concrete.
Fruit tree in the snow.
#9  Fruit tree in the snow.
The garden area and the red currants.
#10  The garden area and the red currants.
The eastern fence line.
#11  The eastern fence line.
The top layer of the concrete is a little flaky because of the extremely cold temperatures.
#12  The top layer of the concrete is a little flaky because of the extremely cold temperatures.
A piece of flaked off concrete.
#13  A piece of flaked off concrete.

Validate:   html5   css3

You are visitor number to this page.
13 items. This page was last updated 2018-08-06 15:45:47 MDT.