13 May 2013

    Links:   [prev]   [next]   [2013]   [home]

Enjoy!

Fixing the Defrost
#1  Fixing the Defrost
Fixing the Defrost
#2  Fixing the Defrost
Hanging Lights
#3  Hanging Lights
So I began taking up subfloor and flooring in the kitchen. Two layers is not my style especially when it bubbles and does not go from wall to wall. I took out about 30 really long nails. Then I told Isaac it was his turn.
#4  So I began taking up subfloor and flooring in the kitchen. Two layers is not my style especially when it bubbles and does not go from wall to wall. I took out about 30 really long nails. Then I told Isaac it was his turn.
So Isaac did his 30 as I requested and then he kept going.
#5  So Isaac did his 30 as I requested and then he kept going.
What a great son to help.
#6  What a great son to help.
So after we finish the top layer of flooring we have the bottom layer to take out. :-)
#7  So after we finish the top layer of flooring we have the bottom layer to take out. :-)
I love our nail collection.
#8  I love our nail collection.
Here are some pictures of the kitchen ceiling for you Cindy.
#9  Here are some pictures of the kitchen ceiling for you Cindy.

#10  

#11  
One florescent light fixture still attached to the ceiling.
#12  One florescent light fixture still attached to the ceiling.
Here's the end of the fixture that fell off the kitchen ceiling.
#13  Here's the end of the fixture that fell off the kitchen ceiling.
Attached kitchen light fixture.
#14  Attached kitchen light fixture.
Unattached kitchen fixture.
#15  Unattached kitchen fixture.

Validate:   html5   css3

You are visitor number to this page.
15 items. This page was last updated 2018-08-06 15:37:11 MDT.