19 Apr 2013, Excavation depth, Septic access

    Links:   [prev]   [next]   [2013]   [home]

Excavation depth, and possible White Trailer septic system cleanout access?

South side. low excavation
#1 ◱ South side. low excavation
West side of excavation, by epud pole.
#2 ◱ West side of excavation, by epud pole.
West and north side of excavation. deeper here. The excavator/cat went out the west side.
#3 ◱ West and north side of excavation. deeper here. The excavator/cat went out the west side.
North and east side of the excavation.
#4 ◱ North and east side of the excavation.
pipe in ground. Some say the sewer pipe to the white trailer is around here.
#5 ◱ pipe in ground. Some say the sewer pipe to the white trailer is around here.
white pipe, tree, and trailer.
#6 ◱ white pipe, tree, and trailer.
white pipe, tree, and bark
#7 ◱ white pipe, tree, and bark
bathtub looking thing west of white trailer.
#8 ◱ bathtub looking thing west of white trailer.
bathtub, tree, and white pipe.
#9 ◱ bathtub, tree, and white pipe.

Validate:   html5   css3

You are visitor number to this page.
9 items. This page was last updated 2018-08-06 15:33:21 MDT.